Differences between revisions 4 and 14 (spanning 10 versions)
Revision 4 as of 2013-05-15 02:01:01
Size: 408
Editor: anonymous
Comment:
Revision 14 as of 2016-05-04 16:47:52
Size: 1444
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
=== Assemblea PreHack === = Assemblea PreHack =
(2008 roma - CSA La Torre, per HackIT Palermo)
Line 7: Line 8:
=== HackMeeting ===  . http://lists.autistici.org/message/20080713.143305.15a02d90.en.html
Line 9: Line 10:
(2009 roma - L38 Squat, per HackIT Milano/Rho)

 . http://lists.autistici.org/message/20090512.100111.8316c5b6.en.html

(2010 firenze - nEXt Emerson durante DIYT per HackIT Roma)

 . http://lists.autistici.org/message/20100517.110735.c20203cc.en.html

(2012 l'aquila - Asilo Occupato per HackIT l'Aquila)

 . http://lists.autistici.org/message/20120110.180725.814b89cd.en.html

= HackMeeting =
Line 11: Line 25:
http://lists.autistici.org/message/20100610.154704.939d2393.en.html   [[http://lists.autistici.org/message/20160501.190037.ae838cb7.en.html|bologna]]

  [[http://lists.autistici.org/message/20100610.154704.939d2393.en.html|roma 2010]]

  [[http://lists.autistici.org/message/20130507.181528.de58ed98.en.html|l'aquila 2012]]
  
  [[https://lists.autistici.org/message/20160501.190037.ae838cb7.en.html|bologna 2014]]

  [[https://lists.autistici.org/message/20160504.144050.79fcc575.en.html|napoli 2015]]
Line 15: Line 37:
http://lists.autistici.org/message/20130507.171141.c57aac9e.en.html
Line 17: Line 41:
[[http://lists.autistici.org/message/20130515.024831.94aaab73.en.html|riassunto del 2012]]
Line 18: Line 44:
Line 20: Line 45:
Line 22: Line 46:

Per i posteri e per gli attuali, qui verrà lasciata memoria delle azioni da intraprendere per tirare su hm2013.

Assemblea PreHack

(2008 roma - CSA La Torre, per HackIT Palermo)

(2009 roma - L38 Squat, per HackIT Milano/Rho)

(2010 firenze - nEXt Emerson durante DIYT per HackIT Roma)

(2012 l'aquila - Asilo Occupato per HackIT l'Aquila)

HackMeeting

Magliette

Manifesti

http://lists.autistici.org/message/20130507.171141.c57aac9e.en.html

Cibo

riassunto del 2012

Ufficio Stampa

Impianto Idraulico

Impianto Elettrico

Rete

HackMeeting2013/Organizzazione (last edited 2016-05-04 16:47:52 by hackmeeting2015)